Top ten tips for building design and construction projects
Top ten tips for the perfect project
If you disagree with our top tips:
- Click on "discussion" above then edit the discussion page and add your tips.
- Or click on "submit comment" at the bottom of the page and send us your ideas.
1. Set it up properly right at the beginning. You won't have time later.
2. You can't do it all yourself. Pick the right people to help you and reward them for success.
3. Make sure you know what you want. Changes get more expensive as you go on.
4. Make sure your aspirations are reflected in your budget. You can’t have a world-class building if you don’t have a world-class budget.
5. Know whether you want quality, low cost or speed. If you want a great building and fast; expect to pay for it.
6. Design fees are a bad place to make savings.
During the life of a building:
Item | Relative cost |
Design fees | 0.1 |
Construction cost | 1 |
Operating costs | 5 |
Business costs | 200 |
7. Manage your stakeholders. Focus your attention on the vocal people who can most affect the project and may be against it.
8. Know what the risks are and who is taking them. Only transfer risks to someone else if they can do something about them.
9. Make sure you have a realistic contingency. But don’t tell anyone about it.
10. If it's not working out, make changes, or walk away.
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.
What about ...
Know your costs from the outset. The only way to make a building cheaper, is to make it smaller. --designing buildings 08:48, 10 July 2012 (BST)
Know what's in your budget and what's not. Equipment may not need to be in the budget, but what about fitting the equipment? --GregorHarvie 08:52, 10 July 2012 (BST)
No planning permission means no project. Get planning permission early, otherwise you could spend a lot of money for nothing.
And be very careful with VAT. is it recoverable or not? Are there some items where it is not recoverable in any event?